PT 1.1: Engineering Goals

Problem statement:

We were tasked to build a bridge that can withstand as much weight as possible without breaking or becoming unstable

Specific Requirements:

The bridge should fit the dimensions given. It should also be made with 500g of ice-cream sticks and should be as light as possible. 

No comments:

Post a Comment